experience to be trusted

What We Offer

At 1st Defense Home Hardening our number one priority is to provide you the homeowner, with a defensible home from an incoming wildland fire. 
We will tailor make a hardening plan that fits your budget.
Identifying the immediate threats to your home and property and prioritizing the fuel reduction plan to optimize the best plan for your budget.  

Home Hardening
0 feet - 5 Feet

Zone 1 Clearing
5 Feet - 30 Feet

Zone 2 Clearing
30 Feet - 100 Feet

Currently offering 10% off Entire hardening package for winter special

Let us protect you and your family

Home Hardening

Roof - 5 Feet
Immediate Zone

Our detailed property and structure assessment is the most detailed assessment on the market. Strictly adhering to the National Fire Protection Association’s (NFPA) 1144 Standard for Reducing Structure Ignition Hazards from Wildland Fire. The Standard for all structure and property assessments in the Wildland Urban Interface areas. 

Complies with Cal-Fires Defensible Space Inspection 

  • Assessment Includes

    Roof & Gutters

    Document the type, condition, and construction of roofing materials.

    No Overhanging material within 10 Feet if roof.

    No Flammable vegetation within 10 feet of chimney, with 1/2" spark arrestor 

    Inspect for any areas for debris and litter to collect, i.e. gutters, skylights, roof valley's, etc.

     

  • Assessment Includes

    Siding

    Inspect all siding. Plug and caulk gaps and joints

    Vertical clearance from ground surface to bottom of siding greater then 6 inches

    Develop adequate defensible space, particularly in the immediate zone.

  • Assessment Includes

    Vents

    Document condition, materials and construction used in eaves of roof overhangs

    Determine Attic and Soffit Vent styles and sizes

    Determine is Foundation Vents are needed

    Discuss color matching of new vents

  • Assessment Includes

    Decks

    Document areas next to or under a structure where combustible materials that present a source of flame exposure to the structure might collect

    Document combustible materials, on, or next to your deck

    Develop adequate defensible space, particularly in the immediate zone

     

  • Assessment Includes

    Windows

    Document the materials used in windows and other openings in vertical openings

    Asses Single, double, or Triple Pane Windows

    Document vegetation within 5 feet of windows

  • Assessment Includes

    Zero - 5"

    Document fallen leaves and needles

    Document and asses tree limbs that extend into this zone

    Hardscaping is strongly recommended around the base of structures

Fire Resistive Vent Installation

The importance of ember and flame entry into vents during wildfires has resulted in the development of vents designed to resist the intrusion of embers and flame

gutterglove

Non-Combustible Gutter Guard Installation

Gutter Guards reduce the amount of vegetation litter and debris that accumulate in your gutter, and, therefore, reduce the need to clean it. Reducing a receptive fuel bed for embers to ignite and catch your home on fire.

address sign vertical 4x4

Reflective Address Sign Installation

Remember that firefighters may need to locate your home quickly at night, during a storm, or in smoky conditions. Help them find your home by making your address clearly visible from the road.

Currently offering 10% off Entire hardening package for winter special

Let us protect you and your family

Zone 1

5 Feet - 30 Feet
Intermediate Zone

The objective of this zone is to reduce the risk of fire spreading from surrounding vegetation to the home. Lean indicates that there is only a small amount of vegetation, if any, present. Vegetation should be grouped in discontinuous islands.

Included

Currently offering 10% off Entire hardening package for winter special

Let us protect you and your family

Zone 2

30 Feet - 100 Feet
Extended Zone

Zone 2 extends from 30′ to at least 100’–more defensible space may be required based on topography, vegetation, or building construction. Work with your neighbor to gain permission to clear defensible space on their property if it will help protect your home.

Included

Contact Us
close slider